Ukraine's defence chief estimates months needed to repair Crimean Bridge damage
Ukrainian Defence Minister Yevhenii Khmara stated that Russian forces will require several months to lift and tow away the damaged section of the Crimean Bridge following a series of attacks.
By Amir Shah ·

Ukrainian Defence Minister Yevhenii Khmara has assessed that Russian forces will need a minimum of several months to repair the significant structural damage sustained by the Crimean Bridge. This statement was made during a meeting between Ukrainian President Volodymyr Zelenskyy and United Kingdom Defence Secretary Wes Streeting, as reported by the Ukrainian news agency Ukrinform.
Khmara detailed the logistical challenges facing the Russian side, noting that the primary task involves lifting the damaged arch and road section of the Kerch Bridge. According to the defence minister, the process of raising this heavy structure and towing it away is complex and time-consuming. He emphasized that the current assessment suggests a timeline of at least several months before the bridge can be fully restored to its original configuration.
The minister highlighted that Russian engineers are actively engaged in evaluating the extent of the destruction. Khmara observed that Russian divers have been deployed to the site to inspect the submerged parts of the structure. The team is currently determining the specific technical methods required to raise the broken sections and move them away from the main span.
The damage to the bridge is the result of a series of strikes that began on the morning of 16 November. Russian-installed authorities in Crimea initially reported that the bridge had been hit, leading to immediate traffic restrictions. The situation escalated on the morning of 17 November when one of the bridge's arches and a section of its roadway collapsed into the sea following a second attack. Consequently, the bridge was closed to both rail and road traffic.
President Zelenskyy provided specific details on the weaponry used during the night of 16 to 17 November. He stated that the defence forces deployed Palianytsia drones to strike the road section of the bridge. In parallel, Neptune missiles, along with Ruta and FP-1 drones, and a Flamingo missile were utilized to target the railway section.
The Security Service of Ukraine revealed that the strikes were part of a successful multi-stage special operation. This operation was planned jointly with other branches of Ukraine's defence forces. The coordinated attacks resulted in the complete destruction of one of the bridge's metal arches and the road span located beneath it.
The attacks continued throughout the week. On 19 November, Ukraine's General Staff and Defence Ministry confirmed a third strike on the Crimean Bridge. This latest attack further damaged the railway section, adding to the overall complexity of the repairs required by Russian forces.
The prolonged closure and damage to the Crimean Bridge have significant implications for logistics and military operations. As Russian divers continue their inspections, the focus remains on the technical feasibility of raising the damaged components. The defence minister's comments underscore the scale of the structural failure and the time required to restore the critical link between mainland Russia and Crimea.






